Fledgling Norwegian land-based salmon farmer, Andfjord Salmon is on track to finish construction of its first 1,000-metric-ton capacity growout pool at Kvalnes, Andoya during the second half of 2020., however stocking has been pushed back until next Spring.

Releasing its financial results for the past six months, Andfjord Salmon said it has ramped up construction of its facilities on Andoya, which allows for the expansion up to 60,000 metric tons of maximum allowable biomass (MAB) in the future.